PDACPA
Well-Known Member
- First Name
- PDA
- Joined
- Feb 21, 2020
- Threads
- 23
- Messages
- 992
- Reaction score
- 411
- Location
- Tampa, FL
- Vehicles
- 2021 Taycan RWD, 1989 911 Carrera
My delivery date still shows a date that is prior to the ship arriving in the port. The other dates did update as the car moved through the process. I believe mine was all prior to the increasing chip issues and the plant shut down for the August holiday and model year change. All speculation on my part.Some weird stuff going on to the TYD site for my car.
When I log into MyPorsche site on the iPhone I get a Production start date of Sept. 17.
Original freeze pt. was Sept. 3.
When I log into the site on my laptop there is no start date listed but that a Prod. Date is assigned - phase 3 says production will start “shortly”! Presumably not accurate.
This morning when I looked onto TYD the Freeze Point was Sept 3 - unchanged.
I logged back onto TYD this afternoon and the Freeze Point is now Oct 29!! Smells like a major delay prob. supply chain related?
I did receive a separate email prev. from Porsche saying my Freeze point was 'coming up' - but based on the original online date it was still a full month away!
Estimated Delivery to Dealer for both cases has not changed and is Nov 19 2021!
My SA will get back with me this wknd as off on vacation but I guess I don't trust a single date here - my main issue is ensuring my last build changes get loaded which has yet to be done.
Sponsored