@Kaytan I'm wondering if the fire at the battery supplier[1] will create a delay to your car even though it's in production?
[1] https://www.taycanforum.com/forum/threads/taycan-delay-8-weeks-due-to-battery-supplier-fire.11560/page-2#post-168764
I have a build that went into production but I'm thinking about picking up a different trim. Is it possible to transfer the purchase agreement to someone else?
Has anyone else's estimated start of production date, past, but TYD is still stuck on scheduled for production? I'm trying to figure out if my car's in production but TYD just hasn't updated or how long should I expect the start of production to be delayed.
He installed a 50 amp circuit breaker. 50 * 0.8 = 40 amps available. And 240V * 40A / 1000 = 9.6kW. But there are other factors like temperature and battery state, which is regulated by the car's charging ability. So at 8.5 KWh, it seems like it's working fine.
I have a 4CT that went to an actual milestone date (5/11) for scheduled for production. I was wondering what are people seeing in how many days it currently takes from moving from scheduled for production to start of production. Thanks!
Exactly the same with me including the 4/4/22 scheduled for production date. Have you tried contacting your dealer? Mine said my car was in production. Originally, I had a 3/1 lock date and 5/6 delivery date.
For a new car that's already at the dealer or for an order? If the car's already at the dealer and you want the car now, I think $3.5k is reasonable given the current situation with supply chain issues.
Have you guys asked your dealer what's the status of your car? — Mine says my car is in production but the Porsche's dealer site is currently down so she's unable to check the actual status.