long wait for production allocation - 4S ST - europe

Stewartt997

Active Member
First Name
Stewart
Joined
May 19, 2022
Threads
11
Messages
39
Reaction score
28
Location
UK
Vehicles
Taycan ST4S
Country flag
I paid deposit on 4SST end March 22 and was given an allocation to confirm my build in July 22, delivery mid November 2022.
Sponsored

 

laua

Well-Known Member
First Name
M
Joined
Apr 23, 2022
Threads
4
Messages
174
Reaction score
217
Location
USA
Vehicles
XC90, V60, CT4S incoming
Country flag
My local dealer in the US quoted a year from order to an allocation, AND a sizable deposit on the day I order. Luckily I got a recommendation to another dealer and got an allocation in ~2 months.
 

DGW

Well-Known Member
Joined
Oct 21, 2020
Threads
0
Messages
165
Reaction score
126
Location
Netherlands
Vehicles
Taycan GTS Rubystar, Fiat 500e La Prima Cabriolet
Country flag
depends on the model, mine was not recent but can give you an idea, checked with my dealership in Jan 2022 - ZERO production slots across all models at that time, could only purchase stock - not an option for me as I wanted to order a GTS with PTS. in May 2022 after the MY23 configurator was refreshed, limited production slots but no PTS slots, finally in August 2022, if I remember correctly there was 1 GTS PTS slot, I took it and finalized the order with downpayment in September, the production is (pre)scheduled now in the first week of June 2023 as it slipped from March to April, now to June.

Also the coming production slot will be MY24 only according to my dealership, the base price has been increased for MY24 since end-March, and the option update will be available in 2-3 weeks maybe shorter from now.
 

Throb

Well-Known Member
Joined
Apr 30, 2022
Threads
8
Messages
528
Reaction score
658
Location
NL & UK
Vehicles
Audi R8 V10, Cayenne EV (on order), BMW iX3 (on order), MB C-Class, Renault R5
Country flag
depends on the model, mine was not recent but can give you an idea, checked with my dealership in Jan 2022 - ZERO production slots across all models at that time, could only purchase stock - not an option for me as I wanted to order a GTS with PTS. in May 2022 after the MY23 configurator was refreshed, limited production slots but no PTS slots, finally in August 2022, if I remember correctly there was 1 GTS PTS slot, I took it and finalized the order with downpayment in September, the production is (pre)scheduled now in the first week of June 2023 as it slipped from March to April, now to June.

Also the coming production slot will be MY24 only according to my dealership, the base price has been increased for MY24 since end-March, and the option update will be available in 2-3 weeks maybe shorter from now.
I have an order with my dealer in the NL for a GTS ST (although not PTS). Placed the order last July and was given a production slot almost straight away for the second week of June. Nothing has changed as of now. A few weeks ago when Mamba Green was removed from the configurator, I checked in with my dealer and he assured me my car is fine as MY24 doesn't start production until July. He also assured me I would not be paying for any price rises, even if it gets delayed and switched to a MY24.
 

Leverage

Well-Known Member
Joined
Sep 28, 2022
Threads
10
Messages
235
Reaction score
172
Location
Belgium
Vehicles
Taycan 4S Cross Turismo
Country flag
same here, waited 8 months for a slot than another 3 months for production of the car & delivery
 


DGW

Well-Known Member
Joined
Oct 21, 2020
Threads
0
Messages
165
Reaction score
126
Location
Netherlands
Vehicles
Taycan GTS Rubystar, Fiat 500e La Prima Cabriolet
Country flag
I have an order with my dealer in the NL for a GTS ST (although not PTS). Placed the order last July and was given a production slot almost straight away for the second week of June. Nothing has changed as of now. A few weeks ago when Mamba Green was removed from the configurator, I checked in with my dealer and he assured me my car is fine as MY24 doesn't start production until July. He also assured me I would not be paying for any price rises, even if it gets delayed and switched to a MY24.
PTS usually adds another 3-4 months on top, at the moment it's 6m+,
Correct, my dealer also confirmed the finalized order/price will be honored as is regardless of further delay. the order was locked on 8th March. I am going to Stuttgart next week and have a Taycan factory tour schedule and i will definitely check with them about the status of my order, and my dealer has provided the communication number they used at the factory.

So the incremental is basically applied to those who didn't yet have a production slot secured despite the order being placed as I understand.
 

whitex

Well-Known Member
Joined
Jul 30, 2021
Threads
87
Messages
8,198
Reaction score
7,236
Location
WA, USA
Vehicles
2023 Taycan TCT, 2024 Q8 eTron P+
Country flag
My local dealer in the US quoted a year from order to an allocation, AND a sizable deposit on the day I order. Luckily I got a recommendation to another dealer and got an allocation in ~2 months.
US allocations situation has gotten better now (as compared to a year or two ago), especially if you're willing to expand you search nationwide. Still depends on the trim though. My personal experience was 20 months first deposit order to delivery, with well over a year waiting for an allocation, which I never got from the dealers I was on the waitlists with, found my own allocation on the opposite side of the continent.
 
 