Hi folks,

I imagine the answer is 'as long as a piece of string'..... but any ideas about typical time between build-slot end and delivery?

I have a build-slot last week in November-first week December, wondering likelihood of delivery before Crimbo?

or as I suspect more likely New Year delivery?

cheers
Sponsored

 

smartymarti

Well-Known Member
First Name
Marti
Joined
Apr 29, 2022
Threads
7
Messages
102
Reaction score
47
Location
Uk
Vehicles
4s cross turismo
Country flag
I’m next in line for a turbo ct at Teeside and even now I’m told it may be this year if not early next year , so to be told you have a build slot make,my dealers even more slower than I thought originally
 
OP
OP
smoothound

smoothound

Well-Known Member
First Name
Alan
Joined
Mar 13, 2021
Threads
124
Messages
819
Reaction score
776
Location
North West UK
Vehicles
CT Turbo Acid Green PTS
Country flag
I’m next in line for a turbo ct at Teeside and even now I’m told it may be this year if not early next year , so to be told you have a build slot make,my dealers even more slower than I thought originally
For clarity I placed my order in October 21
 

TAYC4S

Well-Known Member
First Name
D
Joined
Jun 21, 2020
Threads
16
Messages
524
Reaction score
486
Location
London
Vehicles
911C4S; Jag F-TypeR; Taycan4S; Turbo+992 (ordered)
Country flag
According to OPC Reading (for UK customers) - Taycan and Taycan4S have the longest lead times, then GTS.

Turbo and Turbo S have the shortest - I am assuming because of the high margins they command for Porsche , and probably the fewer orders in comparison (but the last bit is just my assumption)…
 

im85288a

Well-Known Member
First Name
Ian
Joined
May 20, 2022
Threads
5
Messages
129
Reaction score
174
Location
Newcastle
Vehicles
Taycan 4S ST
Country flag
I watched this on YouTube the other day: it seems to indicate the Turbo model is the most rarest (at least that’s how I interpreted it) so that may explain longer wait times for build slots on that model.
 


OP
OP
smoothound

smoothound

Well-Known Member
First Name
Alan
Joined
Mar 13, 2021
Threads
124
Messages
819
Reaction score
776
Location
North West UK
Vehicles
CT Turbo Acid Green PTS
Country flag
Thanks guys - all good stuff - but can we please return to my original question? at least in part?

I have a confirmed build slot in last week Nov to first week December - So typically, how long from then to delivery. Likelihood to be handed over before or after Crimbo?

many thanks
 

WuffvonTrips

Well-Known Member
First Name
Paul
Joined
Oct 24, 2021
Threads
37
Messages
2,043
Reaction score
2,363
Location
Up North
Vehicles
Taycan Turbo CT
Country flag
I have a build-slot last week in November-first week December, wondering likelihood of delivery before Crimbo?

or as I suspect more likely New Year delivery?
Finished cars seem to get transported (by rail) to Emden right away, but I suppose the key factor is how long a car will be sitting there waiting for the next free berth on a ship (mine's been there 2 weeks now).
I think that a normal build duration is less than a week (even allowing for going for Exclusive Manufaktur fitting), so 1 week for that plus up to another week once your car is landed in the UK for it to be transported to your dealer and for them to then prep it, doesn't leave much time for it to catch a boat in time for you to take delivery before Christmas.
 

WuffvonTrips

Well-Known Member
First Name
Paul
Joined
Oct 24, 2021
Threads
37
Messages
2,043
Reaction score
2,363
Location
Up North
Vehicles
Taycan Turbo CT
Country flag
On the other hand, I noticed a recent post in the Delivery Delays thread "a build slot for your vehicle, early October which means you should be able to collect 21st October "!(Sheffield)
 


OP
OP
smoothound

smoothound

Well-Known Member
First Name
Alan
Joined
Mar 13, 2021
Threads
124
Messages
819
Reaction score
776
Location
North West UK
Vehicles
CT Turbo Acid Green PTS
Country flag
Finished cars seem to get transported (by rail) to Emden right away, but I suppose the key factor is how long a car will be sitting there waiting for the next free berth on a ship (mine's been there 2 weeks now).
I think that a normal build duration is less than a week (even allowing for going for Exclusive Manufaktur fitting), so 1 week for that plus up to another week once your car is landed in the UK for it to be transported to your dealer and for them to then prep it, doesn't leave much time for it to catch a boat in time for you to take delivery before Christmas.
Thanks W - Very helpful - That is along the lines of my thinking too. Hope yours gets moving soon.

Cheers
 
Last edited:

Speuk

Well-Known Member
First Name
Simon
Joined
May 6, 2022
Threads
11
Messages
1,141
Reaction score
615
Location
United Kingdom
Vehicles
MY 2023 CT 4S in Dolomite Silver/ MY2025 4S ST in Volcano Grey
Country flag
I’m next in line for a turbo ct at Teeside and even now I’m told it may be this year if not early next year , so to be told you have a build slot make,my dealers even more slower than I thought originally
When did you place your order? Who are you dealing with at Teeside. I'm about to place an order for a CT 4S with them.
 

smartymarti

Well-Known Member
First Name
Marti
Joined
Apr 29, 2022
Threads
7
Messages
102
Reaction score
47
Location
Uk
Vehicles
4s cross turismo
Country flag
I was dealing with Jonathon who is now no longer in the business, my slot was paid for in april but was a cancelled order due to guy getting a gas slot and he originally placed order in nov
 

Midlifecrisis

Well-Known Member
First Name
Ian
Joined
Jul 1, 2021
Threads
38
Messages
1,238
Reaction score
869
Location
Worcestershire
Vehicles
Taycan Turbo, Taycan 4S (sold). Macan SD (sold)
Country flag
My car got built at the beginning of December (2021). I can’t remember the date it completed. Maybe 12th. Got to the uk fairly quickly (before Christmas) but then sat at the port for ages because they all went home and didn’t process any cars over Christmas/new year. I ended up getting it on 11th January. It got to the dealer on 7th.
If you don’t get it before Christmas then it will be a week or two into January. Assuming nothing stops delivery like a missing part. Also depends if it catches a ship quickly or just misses it and waits a week or two for the next one.
 
OP
OP
smoothound

smoothound

Well-Known Member
First Name
Alan
Joined
Mar 13, 2021
Threads
124
Messages
819
Reaction score
776
Location
North West UK
Vehicles
CT Turbo Acid Green PTS
Country flag
My car got built at the beginning of December (2021). I can’t remember the date it completed. Maybe 12th. Got to the uk fairly quickly (before Christmas) but then sat at the port for ages because they all went home and didn’t process any cars over Christmas/new year. I ended up getting it on 11th January. It got to the dealer on 7th.
If you don’t get it before Christmas then it will be a week or two into January. Assuming nothing stops delivery like a missing part. Also depends if it catches a ship quickly or just misses it and waits a week or two for the next one.
Thanks Ian - very helpful.

I have a good idea now

cheers
 

Midlifecrisis

Well-Known Member
First Name
Ian
Joined
Jul 1, 2021
Threads
38
Messages
1,238
Reaction score
869
Location
Worcestershire
Vehicles
Taycan Turbo, Taycan 4S (sold). Macan SD (sold)
Country flag
If the planets align for you then you might hit lucky and get it for Christmas, but I would bet on early January.
 
OP
OP
smoothound

smoothound

Well-Known Member
First Name
Alan
Joined
Mar 13, 2021
Threads
124
Messages
819
Reaction score
776
Location
North West UK
Vehicles
CT Turbo Acid Green PTS
Country flag
If the planets align for you then you might hit lucky and get it for Christmas, but I would bet on early January.
Yup - I think so too!

thanks folks